| The Upper East Side | ![]() | ||||||
| Previous | Next | ||||||
| At the end of the 2008 summer work session Tom and Sandy had helped put in the joists for the raised floor in the north end of the Upper East Side. and built the stud wall for the toilet. Then, during the winter session we usde the butane restraurant heater to warm the end of the space enough to mortar the corner and the the north wall where cracks had appeared sometime during the last several hundred years. | |||||||